7 days until the site specific installation begins

7 days left to rip and wrangle rusted wire cloth, then delicately stitch the wire fragments into biospheres of frail and vulnerable abstract wild bees and organic shapes. Then coat hydro stone and cast shadows, to kinetically unveil the unintended consequences of forcing natural processes into an industrial model. Then pack, transport, unpack, install for 21 days, and open........ find more locations to install......... rinse and repeat.

Work clothes, ladder, shoes and broom neatly organized and ready to be used.

Work clothes, ladder, shoes and broom neatly organized and ready to be used.

Hydro stone station ✅

Hydro stone station ✅

My favorite corner to rip, wrangle, and stitch wire cloth into kinetic sculptures.

My favorite corner to rip, wrangle, and stitch wire cloth into kinetic sculptures.