Sculpture Month Houston - my silo
Day 3- scaffold-
After sleeping on it, I am going to return the scaffold and rent a scissor lift. An awkward 3 level scaffold is just not safe enough for me.
Lighting- I was able to play with the lighting that is installed; it is too central for my piece. Luckily I bought a clamp on fixture with a twenty-five foot cord and ran it around the space to a place I think I like. I won’t know until some work is up. It does look hopeful.
The lighting in the center was not my preference. Lucky for me I happen to have a clamp light fixture which is consistent with the gallery lighting. My fixture has a 25’ cord and there is a place to clamp it right where I think I will like it. I have temporarily wired it in place. I can test it once I get my work delivered.